Barrie, Ontario
The City of Barrie landfill was impacting water resources and required remediation. Golder was retained as the design engineer and construction management firm. The seven-year project involved innovative liner design, waste slope stability assessment and large-scale material management, all in a limited space. The project successfully resulted in the capture of leachate and landfill gas, the improvement of water quality and an 18-year extension of the total lifespan of the facility.
Press release
Canadian Consulting Engineer article